Speed
Project: Dundee Overgate
Location: Dundee
Date Completed: Febuary 2005
Type of Project: Deck Repair
The problem with this four year old car park was that the original car deck
surface was an extremely smooth, power floated, concrete slab. Although a
durable surface ideal for heavy trafficking in the car park environment
meant that there was very little traction for vehicles, resulting in accidents
caused by vehicles and pedestrians slipping on the surface. Another problem caused
by the concrete flooring was the squealing noise created by car tyres on the
surface, something the car park owners were anxious to overcome.
However, we were given the task of completing one deck of 2000m2 in a 5 day
window starting on Sunday. The deck needed to open again on the following Friday for
the busy weekend. A tall order.and an impossible one for most companies.
USL StructureCare's involvement in resolving this problem involved using the
Conideck 2257 system - a rapid curing coating for intermediate decks leading to
minimum down time. This an essential element of refurbishment projects as the
car park needed to be
re-opened as quickly as possible all of this whilst
providing an anti slip surface with excellent aesthetic qualities and extreme
durability.
The system incorporates a high skid resistance value which was tested on site and shown to give more than three times the original surface value.
USL StructureCare achieved the clients technical and logistical requirements in
full.
BACK |